Fig. 2

ASA PS assignment APAC vs. DOS. In the post-intervention period, with the addition of ASA-approved and institutional-specific examples, there is more agreement between APAC and DOS than in the pre-intervention period. When there was a different ASA PS assignment, in almost all cases it was within 1 level